2018 WAN RFP Q&A
- Is your District Office being fed by private fiber which is why it’s not included in the RFP?
- The District Office connection is not part of the RFP.
-
Who is your current provider today?
- This information is included in the RFP.
-
Anything you would change or anything you dislike about the product/service?
- This information is not consequential to responding to the RFP.
-
Is it VLAN or layer 2?
- Layer 2
-
How many fibers do you have today per location?
- 2 strands per location
-
Are the fibers home run to the hub or do they stop first at provider site then to school hub?
- Home run to the hub
-
Are you able to upgrade today without increase in cost per site?
- This information is not consequential to responding to the RFP.
-
What is current speed per site?
- 1 Gb/sec
-
Do these add up to equal or greater than what's delivered at Hub?
- Equal
-
Are you looking for a point to multi-point design (hub and spoke) with the core @ 603 Key Route Blvd?
603 Key Route Blvd - 6G connection. Endpoints @ 1G each
Or
Are you looking for a multi-point to multi-point design(fully meshed)?
603 Key Route Blvd – 6G connection. All other sites @ 1G each?
- Hub and spoke, not mesh. Albany USD would prefer point to point design or equal.